Non-Productive Time for Each Component given Average Production Time Formula

Fx Copy
LaTeX Copy
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component. Check FAQs
ts=tp-(tm+(NttcNb))
ts - Setup Time?tp - Average Production Time?tm - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?Nb - Batch Size?

Non-Productive Time for Each Component given Average Production Time Example

With values
With units
Only example

Here is how the Non-Productive Time for Each Component given Average Production Time equation looks like with Values.

Here is how the Non-Productive Time for Each Component given Average Production Time equation looks like with Units.

Here is how the Non-Productive Time for Each Component given Average Production Time equation looks like.

54Edit=550Edit-(46Edit+(3Edit300Edit2Edit))
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Non-Productive Time for Each Component given Average Production Time

Non-Productive Time for Each Component given Average Production Time Solution

Follow our step by step solution on how to calculate Non-Productive Time for Each Component given Average Production Time?

FIRST Step Consider the formula
ts=tp-(tm+(NttcNb))
Next Step Substitute values of Variables
ts=550s-(46s+(3300s2))
Next Step Prepare to Evaluate
ts=550-(46+(33002))
LAST Step Evaluate
ts=54s

Non-Productive Time for Each Component given Average Production Time Formula Elements

Variables
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Average Production Time
Average Production Time is the time taken to produce a single component out of a lot of produced batches.
Symbol: tp
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Machining Time
Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
Symbol: tm
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to Change One Tool is the measure of time it takes to change one tool during machining.
Symbol: tc
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Batch Size
Batch Size is the count of similar kinds of products to be manufactured.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Credits

Creator Image
Created by Kumar Siddhant LinkedIn Logo
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Formula and 400+ more formulas!
Verifier Image
Verified by Parul Keshav LinkedIn Logo
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Formula and 400+ more formulas!

Other formulas in Average Production Time category

​Go Average Production Time of Each Component
tp=ts+tm+(NttcNb)
​Go Machining Time of Each Component given Average Production Time
tm=tp-ts-(NttcNb)
​Go Time for changing one Tool given Average Production Time
tc=(tp-(ts+tm))NbNt
​Go Batch Size given Average Production Time
Nb=tcNttp-(ts+tm)

How to Evaluate Non-Productive Time for Each Component given Average Production Time?

Non-Productive Time for Each Component given Average Production Time evaluator uses Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)) to evaluate the Setup Time, Non-Productive Time for Each Component given Average Production Time is method to determine maximum time that can be spent to load/unload workpiece and/or reposition tool for manufacturing of single product such that Total Cost of Production is Minimum. Setup Time is denoted by ts symbol.

How to evaluate Non-Productive Time for Each Component given Average Production Time using this online evaluator? To use this online evaluator for Non-Productive Time for Each Component given Average Production Time, enter Average Production Time (tp), Machining Time (tm), Number of Tools Used (Nt), Time to Change One Tool (tc) & Batch Size (Nb) and hit the calculate button.

FAQs on Non-Productive Time for Each Component given Average Production Time

What is the formula to find Non-Productive Time for Each Component given Average Production Time?
The formula of Non-Productive Time for Each Component given Average Production Time is expressed as Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)). Here is an example- 110 = 550-(46+(3*300/2)).
How to calculate Non-Productive Time for Each Component given Average Production Time?
With Average Production Time (tp), Machining Time (tm), Number of Tools Used (Nt), Time to Change One Tool (tc) & Batch Size (Nb) we can find Non-Productive Time for Each Component given Average Production Time using the formula - Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)).
Can the Non-Productive Time for Each Component given Average Production Time be negative?
No, the Non-Productive Time for Each Component given Average Production Time, measured in Time cannot be negative.
Which unit is used to measure Non-Productive Time for Each Component given Average Production Time?
Non-Productive Time for Each Component given Average Production Time is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Non-Productive Time for Each Component given Average Production Time can be measured.
© 2024-2025. Developed & Maintained by softUsvista Inc.
Copied!