Production Cost of Each Component
Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: Cpr
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Total Non Productive Cost
Total Non Productive Cost is the amount spent on activities that do not result in any productivity or profit to the plant during the manufacturing of a batch of components.
Symbol: Cnp
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Total Machining And Operating Cost
Total machining and operating cost involves considering various cost factors, including material costs, labor costs, machine operating costs, tool costs, overhead, and additional related expenses.
Symbol: Cm
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Total Tool Changing Cost
Total Tool Changing Cost involves accounting for both the direct and indirect expenses related to the tool change process.
Symbol: Tcc
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Total Tool Cost
Total tool cost involves accounting for the purchase price of the tools, their usage rates, and any costs associated with their maintenance and replacement.
Symbol: t
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.